SiteCore Diesel 20 kVA sizing

Map essential circuits, expected running hours, and the first loading order for this diesel set. Start with lighting, security, refrigeration, and gate motors before adding heavier equipment. That approach helps keep the set within a sensible operating band during longer outages.

A dark gray diesel generator sits on a concrete pad beside a white house, with a worker kneeling nearby and black fuel cans on grass.

Sizing guide for SiteCore Diesel 20 kVA

Sizing a diesel set begins with the actual loads that must stay on, not the total DB capacity. Note each item’s running demand and any high starting current from pumps, compressors, or aircon units before you count them together. On Highveld sites, cold morning starts and altitude can change how a diesel set is expected to carry the first few minutes of load.

The installation setting matters as much as the kVA number. A unit placed in a residential complex needs different noise and exhaust planning from one serving a workshop, farm shed, or site office. Check tank access, cable route, earthing arrangement, and ventilation openings before finalising the size against the application.

Record the first commissioning run with meter readings visible at the panel. Include voltage, frequency, and the connected load so later checks have a clear reference point. If a transfer setup, fuel line, or earth connection is altered afterwards, that first record makes fault-finding far more direct.

20 kVA load planning

Different sites call for a different loading order on a 20 kVA diesel set. A small retail unit may prioritise tills, lights, and fridges, while a farm may place borehole supply ahead of workshop tools. Where remote start is fitted, test the sequence with the transfer equipment under the same conditions expected during outages.

  • List fixed loads before movable appliances
  • Check usable fuel against outage pattern
  • Test ATS timing with essential circuits
  • Log hours after each backup cycle

For a fuller picture, read the related site guide and runtime note alongside the sizing guide. If your installation includes mixed motor loads, longer outage windows, or a non-standard changeover arrangement, use our contact form with the main load details and site location.

Signs the set is undersized

Pause the selection if voltage dips badly when a pump starts, if the planned fuel window is too short, or if nuisance tripping appears once key circuits are added. Those are usually signs that the load list or starting demand needs to be reviewed before proceeding. For some sites, opening a different guide is more useful than forcing the unit into a duty it was not meant to carry.

If a sizing discussion moves between branches, include the genset model, the intended site use, and the circuits counted so far. Notes that mention centres such as Clearwater, Cresta, Pavilion, Tyger Valley, Baywest, Mimosa, and Riverside help keep the same specification in view when the enquiry changes hands.

What our Backup Genset customers say

Verified Google reviews

Tell us about your backup power

Send a note through our contact form with the circuits you need to keep running, the kind of site, your fuel preference, how the changeover works today and your area, and we will come back with practical genset options and a quote.

Open the contact form