Load step planner
Stage compressors after lights.

Staged starting order
Stage compressors after lights. Print it. Pin it. Update it when hours or fuel marks change. These cards stay in the plant room.
Use this planner to set the switching order for lights, pumps, compressors and other larger loads after a mains failure. Ask via our contact form for a blank card that matches your site labels, then keep it with Runtime notes and the matching genset guide at the board. Keep the written kW figures, breaker names and fuel dip marks aligned with what is installed on site.
Technician copy locations
- Laminate one sheet beside the AMF panel
- File one copy with the logbook
- Photograph updates after service
Light slip: its fine if the card gets oily. A clean unread card helps nobody.
Load pick-up sequence
When mains power drops, a careful order for load pick-up helps the site stay steady and easier to manage. Start with the loads that matter most to people, stock and critical services, then bring in larger equipment in stages so the backup system is not asked to do everything at once. That approach suits South African homes, townhouse estates, clinics, farms, shops, forecourts, telecom huts and work sites.
Reliable Generator supplies gensets and backup power gear with written sizing and runtime guidance, plus remote checks and warranty help. Their range includes home standby gensets, silent canopy packs, diesel site and trailer gensets, transfer switches, load and changeover panels, fuel tanks and service spares. If you are matching a new panel or revising an existing one, keep the load order written clearly and aligned with the site labels.
Keep the card site specific
The card should be simple enough for your own qualified electrician or contractor to read quickly during an outage or test. Use the labels already fitted at the board, and keep the notes where they can be found without guesswork. For changes after maintenance, use the updated order before the next outage arrives.
- List the essential loads first, then larger motors and compressors.
- Match each load to the correct breaker name and site label.
- Check that transfer switches and changeover panels are named clearly.
- Keep fuel tank notes, service spares and dip marks consistent with the site setup.
If you need a blank card that matches your labels, use the contact form and ask for it. You can also visit a showroom by appointment in Clearwater, Cresta, Pavilion, Tyger Valley, Baywest or Riverside, or speak with head office at 2 Makro Place, Sunnyrock, Germiston.
Update after site changes
Load order notes are most useful when they stay current. Update them after a panel change, added equipment, battery replacement, altered running load or service work. That keeps the written plan useful for homes, estates, clinics, farms, shops, forecourts and work sites where backup power must be easy to understand under pressure.
Keep an eye on the practical details too, such as earth bonding, noise and exhaust placement, coastal humidity, Highveld dust and winter starts. If you need support with sizing, runtime guidance or service wording, Reliable Generator can help, and your own qualified installer can carry out the wiring and commissioning.
What our Backup Genset customers say
Verified Google reviews
Also worth a look




Tell us about your backup power
Send a note through our contact form with the circuits you need to keep running, the kind of site, your fuel preference, how the changeover works today and your area, and we will come back with practical genset options and a quote.
Open the contact form