Load manager

Staged load steps so compressors do not brown lights.

Grey load manager cabinet mounted on a wall beside an open doorway, with a beige generator outside in warm light.

Load sequencing at the panel

A load manager standard stages heavy circuits onto the generator in the right order, so motors and compressors do not all hit the alternator at once. On South African sites with cold rooms, borehole pumps or workshop air systems, that step-by-step pickup helps keep voltage dip under control and stops nuisance trips during changeover.

Use it alongside Gensets and the selected site route when startup load needs to be split into timed steps. Send the panel schedule through our contact form with the town, main loads, and whether the board is tied to ATS or manual changeover gear so the relay setup matches the installation.

Around Germiston, load control boards are normally checked against the actual outgoing circuits rather than a generic label list. That matters when a site has mixed duties such as office lights, refrigeration, security fencing and a single large compressor, because each step needs the correct priority and delay.

Commission notes

  • Set delays for motor and compressor loads
  • Mark essential and non-essential feeders clearly
  • Record step order inside the door
  • Run one staged pickup test on site

The front of the panel should show which circuits come on first, which are delayed, and which stay locked out on generator supply. If the board has adjustable timers, note the final settings on the drawing pocket or door card so the night shift is not left guessing after a trip or battery isolation.

Cold rooms often need compressors to start in order, not all at once. A load manager standard spaces those steps so the generator is not hit by one hard surge, and lighting circuits are less likely to dip when motors pull in. On mixed sites, essential sockets, security and office loads can be held ahead of non-critical plant.

Service travel

Checks before handover usually include relay timer settings, contactor condition, control fuse ratings and labelling of each managed circuit. Highveld winter mornings can expose weak batteries and sticky contactors, while coastal moisture makes enclosure sealing and terminal tightness more important in outdoor or semi-open plant areas.

Browse Runtime for habits that sit beside this kit. Browse Resources for printable cards.

If a step does not pull in during testing, capture the indication lamps, relay numbers and the affected outgoing way before parts are swapped. Fault finding is faster when the issue is narrowed to a timer, contactor coil, auxiliary contact or loose control wiring rather than treating the whole panel as failed.

Commissioning points for staged loads

Confirm that essential circuits energise first and that delayed steps come in cleanly without dragging engine speed down. Check interlocks, earth bonding, door labels and manual overrides before sign-off, especially where more than one shift will operate the generator during the grid outages.

What our Backup Genset customers say

Verified Google reviews

Tell us about your backup power

Send a note through our contact form with the circuits you need to keep running, the kind of site, your fuel preference, how the changeover works today and your area, and we will come back with practical genset options and a quote.

Open the contact form